@article{oai:jaxa.repo.nii.ac.jp:00032687, author = {小野田, 淳次郎 and 富澤, 利夫 and 中田, 篤 and 橋元, 保雄 and 今澤, 茂夫 and 市田, 和夫 and 森, 大吉郎 and ONODA, Junjiro and TOMIZAWA, Toshio and NAKADA, Attsushi and HASHIMOTO, Yasuo and IMASAWA, Shigeo and ICHIDA, Kazuo and MORI, Daikichiro}, journal = {宇宙科学研究所報告}, month = {Oct}, note = {This report presents the outline of the rocket structural testing facility constructed in Sagamihara campus of ISAS in 1984. The facility is composed of a) a 12m long, 8m tall, 6m wide testing stand, b) a 2-channel 70 MPa hydropressure loading device with a control unit, c) a 600-channel strain/displacement measureling system, and d) a data acquisition, processing and display system. Although the planning of the facility was motivated by the structural testings required in the process of development of Mu-3SII launch vehicle, it was designed so as to carry out the various structural testing of various kinds of structures as flexibly and efficiently as possible., 資料番号: SA0166150000}, pages = {1--21}, title = {ロケット構造試験装置}, volume = {40}, year = {1986} }